SVS/FAT/100

SVS/FAT/100

Factory Acceptance Test (FAT) and Report

The objective of the FAT is to provide confidence that the system to be delivered meets user requirements. Curtiss-Wright products are modular and are therefore tested on both an individual level and within a system. The FAT is performed using DAS Studio 3 and IADS RT Station software. The resulting procedure report is provided to the customer.

The FAT is a procedure based on a customer order and can be either standard or non-standard. A non-standard FAT must be pre-agreed before testing begins. Visit dates for witnessing the FAT must be agreed at time of order confirmation. If witnessing of the FAT is not required, this must be confirmed with Curtiss-Wright.

As configuration varies, preparation is necessary. Therefore SVS/PRP/100 must also be ordered.

If training is requested at the ACRA Dublin factory, then order SVS/TRN/100. For customer site training, order SVS/OSV/100.
 

Download the data sheet
SVS/FAT/100
  • Key Features
  • Applications
  • Specifications
  • Related Products
  • Standard FAT for each standard unit in the customer order, with report generated
  • Customized, non-standard procedure can be pre-arranged if requested
  • Customers witness first hand the FAT
  • Customers are charged per day of FAT
  • Standard and non-standard FAT
  • FAT report
Description Backshell for CON/PSU/007
Function Backshell

Request Information

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
SVS/FAT/100

SVS/FAT/100

Factory Acceptance Test (FAT) and Report

The objective of the FAT is to provide confidence that the system to be delivered meets user requirements.